HRM FPX 5402 Assessment 1 Workforce Demand Forecast example

Reviewed by Rupert Danvers, MBA Planning, Sourcing, and Developing Talent in Healthcare Organizations Capella University Free custom sample in 24 to 48h

This HRM FPX 5402 Assessment 1 sample paper builds a workforce demand forecast for a surgical nursing unit from a single dated driver: projected surgical volume. It was written for Capella HRM FPX 5402, Planning, Sourcing, and Developing Talent in Healthcare Organizations, an MS in Human Resource Management course listed as HRM-FPX5402. The paper converts volume into nursing hours and then into full-time equivalents, adds a relief factor for vacation, sick time and education, and splits the result into skill mix by scope of practice. It nets in current vacancies and expected turnover, gives the forecast as a range with its assumptions listed and explains why one driver was used rather than several.

CourseHRM FPX 5402 Planning, Sourcing, and Developing Talent in Healthcare Organizations
AssessmentAssessment 1
Paper typeWorkforce demand forecast
LengthAbout 1,140 words, 5 pages
FormatAPA 7 student paper
SchoolCapella University
ProgramMS in Human Resource Management
UpdatedSeptember 2026

Free sample paper for HRM FPX 5402 Assessment 1

1

A Workforce Plan for a Surgical Nursing Unit: One Dated Demand Driver, Volume Converted to Hours and Then FTEs, a Relief Factor for Absence, Skill Mix by Scope, Vacancy and Turnover Netted In, and a Range With Its Assumptions

Student Name

Capella University

HRM FPX 5402: Planning, Sourcing, and Developing Talent in Healthcare Organizations

Instructor Name

Month Day, Year

What this part is doingThe title names the unit and the plan's steps. Workforce plans are judged on whether the arithmetic follows from a stated driver, so the driver leads.
2

One Demand Driver, Dated and Sourced

The plan uses one demand driver: forecast patient days on 4 West, a 32-bed surgical unit in the composite Cedar Valley hospital, for the fiscal year beginning July 1. The source is the hospital's finance department forecast dated April 15, which projects an average daily census of 30 patients, up from 28 in the current year, because a second orthopedic surgeon joins in August and elective joint replacement volume is expected to rise. Forecast patient days: 30 times 365, or 10,950. Using one driver keeps the plan traceable; other influences, such as length of stay changes, are captured in the range below.

Volume Converted Into Hours, Then Equivalents

Volume is converted to nursing hours using the unit's target nursing hours per patient day of 8.0, set by the nursing department based on the unit's patient acuity and its staffing plan. Required productive hours: 10,950 patient days times 8.0, or 87,600 hours. These are hours of direct care time on the unit. Aiken et al. (2002) linked heavier patient loads per nurse to more surgical deaths and more nurse burnout, which is one reason the hours target is treated as a floor, not a figure to be trimmed to meet budget. The hours target is the patient-safety number. Everything after it is arithmetic.

A Relief Factor That Covers Absence

Hours at the bedside fall short of hours on the payroll, because staff take vacation, sick time, education, and holidays. The unit's nonproductive time last year was 12% of paid hours. Paid hours needed: 87,600 divided by 0.88, or about 99,545. Full-time equivalents, at 2,080 paid hours each: about 47.9. Without the relief factor, the plan would budget 42.1 equivalents and leave the unit short every time someone takes a day off.

What this part is doingRelief is added before converting to FTEs. Scorers reward plans that account for nonproductive time.
3

Skill Mix Split by Scope of Practice

The 8.0 hours per patient day are split by scope of practice. Registered nurses provide assessment, care planning, medication administration, and patient teaching, which cannot be delegated; nursing assistants provide hygiene, mobility, vital signs, and intake and output. The unit's staffing plan allocates 5.2 hours per patient day to registered nurses and 2.8 hours to nursing assistants, a 65 to 35 split. Registered nurse FTEs: 47.9 times 0.65, or 31.1. Nursing assistant FTEs: 47.9 times 0.35, or 16.8. The split follows what each role can legally and safely do, not only what each role costs.

Vacancy and Turnover Netted In

The plan compares need with current staff and expected losses. Registered nurses: current filled 27.4 FTEs, with 2.0 vacant. Need 31.1. Gap from growth and vacancy: 3.7. Turnover last year was 18%, so about 4.9 FTEs are expected to leave during the year. Hiring need: 3.7 plus 4.9, or about 8.6 FTEs. Nursing assistants: current filled 14.5. Need 16.8. Gap: 2.3. Turnover was 30%, so about 4.4 FTEs are expected to leave. Hiring need: about 6.7 FTEs. Because new hires take time to become productive, the plan starts recruiting for the August volume increase in May.

What this part is doingCurrent staff, the gap, and expected turnover are combined into a hiring need. Scorers reward plans that include attrition.
4

A Range With Its Assumptions Listed

The plan gives a range rather than a single number. Low case: census of 29, nonproductive time of 11%, registered nurse turnover of 15%, giving about 45.7 total FTEs and about 6.4 registered nurse hires. Base case, as above: 47.9 total FTEs and 8.6 registered nurse hires. High case: census of 32 as joint volume grows faster, nonproductive time of 13%, and turnover of 20%, giving about 51.6 total FTEs and about 11.7 registered nurse hires. Assumptions: the finance forecast is accurate within about 2 patients per day; hours per patient day stay at 8.0; nonproductive time stays near 12%; turnover stays near last year's rates; and no change in the skill mix is approved during the year. A single number hides the question of what happens if the surgeon's schedule fills faster than expected.

Why One Driver and Not Several

Other drivers were considered. Emergency department admissions affect surgical unit census, and length of stay could shorten with a new joint replacement pathway. Adding these as separate drivers would multiply assumptions without adding accuracy, because the finance forecast already reflects expected admissions and length of stay. Instead, the range below widens to account for them. Keeping one driver also makes the plan easy to update: when finance revises its forecast, the rest of the plan follows by arithmetic.

What the Numbers Mean on the Floor

For the unit manager, 31.1 registered nurse FTEs means about 156 registered nurse hours a day at the average census, or roughly 7 registered nurses on each 12-hour day shift and 6 on each night shift, with the charge nurse included. For nursing assistants, 16.8 FTEs means about 84 hours a day, or about 4 on days and 3 on nights. These patterns give the manager a check: if the schedule cannot be built with these numbers, the hours target or the relief factor needs review.

New Graduates and Onboarding Load

Of the 8.6 registered nurse hires, the manager expects about 5 to be new graduates, since experienced surgical nurses are scarce locally. New graduates need about 12 weeks of orientation with a preceptor, during which they are not counted as full staff. The plan therefore adds about 1.2 FTEs of orientation time for the year, to be funded from the education budget rather than unit staffing.

Checking the Plan Against Last Year

As a check, the same method applied to last year's census of 28 gives about 44.7 FTEs, close to the 44.1 the unit actually used including overtime and agency hours. The small difference suggests the method describes the unit's real needs rather than an idealized one.

Uses of the Plan

The plan sets the recruiting target for the year, informs the nursing budget, and tells the unit manager how many new graduates the unit's preceptors must absorb. It will be updated in October with actual census data from the first quarter, and again in January if the orthopedic volume differs from the forecast by more than two patients a day.

Conclusion

Starting from a dated finance forecast of 10,950 patient days, the plan converts volume to 87,600 productive hours, applies a 12% relief factor to reach 47.9 FTEs, splits them into 31.1 registered nurse and 16.8 nursing assistant FTEs by scope of practice, and nets in vacancies and turnover to a base hiring need of about 8.6 registered nurses and 6.7 nursing assistants, within a range whose assumptions are stated.

5

References

Aiken, L. H., Clarke, S. P., Sloane, D. M., Sochalski, J., & Silber, J. H. (2002). Hospital nurse staffing and patient mortality, nurse burnout, and job dissatisfaction. JAMA, 288(16), 1987-1993. https://doi.org/10.1001/jama.288.16.1987

HRM FPX 5402 Assessment 1 instructions, in plain terms

The first assessment in HRM FPX 5402 asks you to forecast how many staff a health care unit will need. You choose the demand driver, such as patient days or surgical cases, and source its projection, convert that volume into hours of care using a productivity standard, turn hours into full-time equivalents, add a relief factor for paid time off and training, divide the total among roles by scope of practice, subtract current staff and account for expected turnover, and present the result as a range with stated assumptions. Hospital budgets, nursing hours per patient day benchmarks and Bureau of Labor Statistics projections support the forecast.

How the HRM-FPX5402 Assessment 1 example is put together

The example runs as a chain any reader can audit line by line. It opens with the service and the planning horizon, then states the demand driver and where that volume figure came from. A conversion section turns volume into hours using a ratio or standard the writer cites, then hours into equivalents using an annual paid hours figure stated on the page. Coverage follows: shifts to be filled, days they run, and the relief factor with its components broken out. A skill mix section distributes the requirement across roles inside scope of practice limits. An attrition section adjusts for current vacancies and expected departures. Sensitivity comes next, showing what the requirement becomes if volume lands above or below the estimate. The close ranks the roles by urgency and lists every assumption in one place.

Reading the HRM FPX 5402 Assessment 1 scoring guide

Capella's scoring guide rates the demand driver, the conversion to hours and FTEs, the relief factor, the skill mix, the netting of supply and the treatment of uncertainty. The driver reaches Distinguished when a single driver is dated and sourced, such as the hospital's projected surgical cases for the next fiscal year. The conversion scores higher when each step, volume to hours to FTEs, is shown with its standard. The relief factor earns credit when calculated from real absence patterns rather than guessed. Skill mix is judged on whether roles are divided by what each license allows, since registered nurses and nursing assistants are not interchangeable. Supply should net in both vacancies and turnover. The range should list the assumptions that drive it. Proficient forecasts produce a number; Distinguished ones show how it would move if the driver changed.

Common HRM FPX 5402 Assessment 1 mistakes, and how to avoid them

Workforce forecasts often start from current headcount and add a percentage, which ignores whether volume is changing. Another weakness is using several drivers at once without explaining how they combine, so the forecast cannot be checked. Hours are converted to FTEs without a relief factor, which understates need by ten to fifteen percent. Skill mix is ignored, treating all nurses as one pool. Turnover is left out, so the plan fills today's vacancies and falls behind next year. The forecast is given as a single figure with false precision. Laying out the calculation in a short table, with each step and its source in its own row, makes the forecast transparent and gives the sourcing strategy in Assessment 2 a clear target.

Get a HRM FPX 5402 Assessment 1 example written to your instructions

Send the instructions and the scoring guide from your courseroom, plus the service and whatever volume figures you are permitted to share. Your custom HRM FPX 5402 Assessment 1 example is written to those criteria with the arithmetic shown on your own numbers, and it arrives in 24 to 48 hours. First sample, no charge. The paper above is an original model document written by our desk, not a submitted student paper and not an official Capella University document.

More HRM FPX 5402 papers and MS in Human Resource Management samples

HRM FPX 5402 Assessment 1 questions, answered

Where do the productivity ratios come from?

Published sources carry them when internal standards are unavailable. Professional association staffing guidance, national occupational data and benchmarking reports all give defensible bases, and the criteria care that the basis is named and cited rather than that it is proprietary. The example labels each ratio as an assumption, cites where it came from, and shows the effect of using a different one.

Does the forecast have to include a relief factor?

Where the service runs beyond a single weekday shift, leaving it out breaks the model. Positions covering nights, weekends and holidays need more than one equivalent per line on the roster, and orientation and required education take people off the floor as reliably as vacation does. The example builds the factor from its components and shows the requirement with and without it.

How far ahead should the horizon run?

Far enough that hiring and credentialing could actually happen inside it, which for licensed roles is rarely a matter of weeks. A horizon shorter than the time to recruit and credential produces a requirement nobody can act on. The example sets a horizon tied to the service change driving it and states the lead times that shaped that choice.

Where can I find a free HRM FPX 5402 Assessment 1 sample paper?

The surgical unit's staffing forecast is worked through on this page, with one dated demand driver, volume converted to hours and FTEs, a relief factor, skill mix by scope and a range with its assumptions. Sourcing builds on it.

What is a relief factor in HRM FPX 5402 Assessment 1?

An adjustment that adds staff to cover time when employees are paid but not working, such as vacation, sick leave and training. Without it, the unit is short every time someone is off.