Free sample paper for BHA FPX 2110 Assessment 3
Implementing and Sustaining the MRI Wait Reduction: Owners by Position, Staged Gates, Resistance by Group, and Decision Rules After Handover
Student Name
Capella University
BHA FPX 2110: Healthcare Operations and Process Improvement
Instructor Name
Month Day, Year
The Change Being Implemented
Northbrook Regional, a composite 300-bed hospital, has a median wait of 12 days from outpatient MRI order to scan, against a target of 5 days. The analysis identified daytime capacity on the hospital's single outpatient scanner as the constraint, and the improvement plan applied the Theory of Constraints: reduce gaps between patients by preparing them in advance, fill canceled slots, adjust slot lengths, present evening times before daytime ones to patients able to come then, complete authorization before scheduling daytime slots, and add Saturday hours if needed. Goldratt and Cox (1984) emphasized that once the constraint has been improved, the organization must keep managing it, or performance slips back. This paper sets out how the changes will be implemented and sustained.
Owners Named by Position, Not Department
Each change has an owner named by position, so that responsibility is clear and survives staff turnover. The imaging director is the executive owner of the whole project and approves staffing changes and budget. The lead MRI technologist owns the patient preparation area and the reduction in gaps between scans, including training technologists and the new imaging aide. The imaging scheduling supervisor owns the cancellation fill list, reminder calls, and the practice of offering evening slots first. The prior authorization supervisor owns the rule that authorization is complete before a daytime slot is booked. The chief of radiology owns the review of slot lengths by protocol, since changes to protocols require radiologist approval. The imaging department's business analyst owns the weekly measurement report. Assigning ownership to "imaging" or "scheduling" would leave each person able to assume someone else was responsible.
A Staged Timeline With Entry Gates
The changes are staged, and each stage begins only when its entry gate is met. Stage 1, weeks 1 to 4: patient preparation area and reminder calls. Entry gate: an imaging aide hired or reassigned to prepare patients, and a room identified and equipped for changing and safety screening. Work: move preparation out of the scanner room, begin reminder calls and texts. Stage 2, weeks 5 to 8: scheduling changes. Entry gate: Stage 1 gaps between scans reduced to 6 minutes or less for two consecutive weeks. Work: cancellation fill list, evening slots offered first, authorization before daytime booking. Stage 3, weeks 9 to 12: slot length review. Entry gate: chief of radiology has reviewed protocols with the lead technologist and approved revised slot lengths. Work: revise the scheduling template. Stage 4, from week 13 if needed: Saturday hours. Entry gate: median wait still above 5 days after Stage 3, and two technologists recruited for Saturday shifts. Work: open Saturday outpatient hours from 8 a.m. to 4 p.m. Gates prevent the next stage from starting before the previous one works, which avoids layering changes on an unstable process. Entry gates tie progress to evidence, so a stage begins because the previous one worked, not because a date arrived.
Resistance Addressed by Staff Group
Different groups will resist for different reasons, and each is addressed directly. Technologists may resist the preparation area if they see it as taking away patient contact or adding work. The lead technologist will involve them in designing the preparation workflow, and the aide will handle changing and paperwork, leaving technologists to focus on scanning and the final safety check. Schedulers may resist offering evening slots first because patients sometimes react with frustration. The scheduling supervisor will provide a short script explaining that evening slots are available sooner, and schedulers will not be required to push evening slots on patients who decline them. Radiologists may resist shortening slot lengths if they believe image quality will suffer. The chief of radiology will lead the review and approve changes only where protocol times allow, and image quality will be monitored. Patients may resist evening appointments. The plan does not require them; it offers them first and records choices, so that patients who need daytime slots still receive them. Technologists asked to work Saturdays may resist schedule changes. Saturday shifts will be filled first by volunteers and new hires, with a shift differential.
Process and Outcome Measures Kept Apart
Process measures show whether the changes are being carried out; outcome measures show whether they are producing results. Keeping them apart shows whether a disappointing outcome comes from changes not being done or from changes not working. Process measures: median gap between scans; percentage of canceled slots refilled; percentage of patients offered an evening slot first; percentage of daytime slots booked with authorization complete; Saturday slots available. Outcome measures: median days from order to scan; daytime scanner utilization; the proportion of all outpatient scans performed after 7 p.m. or on Saturdays; patient complaints about scheduling.
Decision Rules and Sustainment After Handover
After Stage 4, or after 16 weeks if Stage 4 is not needed, the project hands over to daily operations. Sustainment depends on decision rules, stated in advance, that tell managers what to do when measures change. If the median wait exceeds 7 days for three consecutive weeks, the imaging director reconvenes the project team to identify whether the constraint has moved. If the median gap between scans exceeds 8 minutes for two consecutive weeks, the lead technologist reviews the preparation workflow. If the refill rate for canceled slots falls below 60% for a month, the scheduling supervisor reviews the fill list process. If evening and weekend scans fall below 20% of volume while daytime demand rises, the imaging director considers extending Saturday hours or adding a weekday evening shift. If the wait remains above target six months after handover despite these actions, the hospital reopens the analysis of a second scanner. The weekly measurement report continues after handover and is reviewed monthly at the imaging department's operations meeting. The business analyst will keep the report's definitions unchanged, so that results after handover can be compared directly with the baseline and with the project period. Decision rules stated in advance let managers act on the data without reopening the whole project each time a number moves.
Conclusion
The plan names owners by position, stages the changes with entry gates, addresses resistance group by group, keeps process and outcome measures apart, and sets decision rules that sustain the improvement after the project team hands over to daily operations.
References
Goldratt, E. M., & Cox, J. (1984). The goal: A process of ongoing improvement. North River Press.
Reading the BHA-FPX2110 Assessment 3 instructions
To finish the course, you turn the Assessment 2 improvement into a plan for rollout and evaluation. You identify stakeholders and owners, set a staged timeline, plan resources and training, address resistance, define process and outcome measures, and describe how results will be evaluated and the change sustained. Owners should be positions, so the plan survives staff changes. Stages with entry criteria prevent rushing into full rollout before a pilot shows results. Measures should include both whether the new process is followed and whether waits actually shorten. Change management and operations sources support the plan. A department manager should be able to run the change from this document alone.
How this BHA FPX 2110 Assessment 3 example is built
The document splits cleanly in half and the example keeps the halves visibly separate. The implementation side opens with a stakeholder section that names positions and their stake, moves to a staged timeline with an owner against each stage, then handles resources, training and the communication a unit would actually receive. The evaluation side opens with the measures, one process measure and one outcome measure at minimum, then the collection method, the interval and the decision rule attached to each. A change management model appears where it earns a place, usually against the resistance section rather than as a decorative frame at the top. The closing section covers sustainment: what gets audited after the project ends and who owns it. Headings track the criteria language so a faculty reader can score without reconstructing the document.
BHA FPX 2110 Assessment 3 scoring guide: what Distinguished looks like
The scoring guide rates the stakeholders and owners, the timeline, the resistance plan, the measures and the sustainment plan. Owners reach Distinguished when named by position with clear accountability, such as the imaging manager owning evening staffing. The timeline scores higher when staged with entry gates, for example moving to full rollout only after four weeks of filled evening slots. Resistance earns credit when addressed separately for technologists, schedulers and radiologists. Measures should keep process and outcome separate. Sustainment rewards decision rules after handover, such as what triggers a review if waits rise. Resources and training complete the plan. Writing and APA are graded.
BHA FPX 2110 Assessment 3 help: mistakes that cost marks
Students often write a timeline without stages or owners, which leaves no one accountable when a step slips. Another common mistake is assigning ownership to departments rather than positions. Resistance is treated as one problem, though technologists asked to work evenings have different concerns from schedulers learning a new template. Measures mix process and outcome. Sustainment is ignored after launch, so gains fade within months. Resources and training are missing. Decision rules, such as reviewing the schedule if waits rise above a threshold, make the plan durable. A one-page summary of stages, owners and gates is a useful addition.
Get a BHA FPX 2110 Assessment 3 example written to your instructions
Send the instructions and the scoring guide for BHA FPX 2110 Assessment 3 from your courseroom, plus the intervention you proposed earlier in the course. A custom example comes back in 24 to 48 hours with owners, staged timeline, resistance handling and measures written to your criteria. The first one is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Capella University document.
More BHA FPX 2110 papers and BS in Health Care Administration samples
- BHA FPX 2110 Assessment 1: Process Analysis
- BHA FPX 2110 Assessment 2: Improvement Proposal
- BHA FPX 3001 Assessment 3: Policy Issue Paper
- BHA FPX 2106 Assessment 3: Improvement Recommendation
- BHA FPX 3004 Assessment 3: Quality Evaluation Plan
- BHA FPX 2102 Assessment 3: Self-assessment Paper
BHA FPX 2110 Assessment 3 questions, answered
What counts as a measure in the evaluation section?
Something a real unit already records or could record without a new system. Time stamps from the electronic record, audit counts from a weekly sample, readmission or fall rates already tracked by quality. The example pairs one process measure showing the change is happening with one outcome measure showing it mattered, and gives each an interval and a threshold.
Do I need a change management model like Kotter or Lewin?
Many sections ask for one, and the example includes it where it does work rather than as an opening frame. Lewin suits a plan built around unfreezing an entrenched routine, Kotter suits a longer multi-stage rollout with coalition building. Whichever appears, its stages should map onto the actual timeline in the plan, otherwise the reader sees a citation and no application.
How long should the implementation timeline be?
Long enough that the measures could show something. A four week rollout with a monthly outcome measure produces one data point and cannot support a conclusion. The example runs a staged schedule where the process measure starts collecting during rollout and the outcome measure has at least a few intervals before the evaluation point arrives.
Where can I find a free BHA FPX 2110 Assessment 3 sample paper?
This page contains the full implementation and evaluation plan for the MRI wait reduction, with owners, staged gates, resistance by group, measures and sustainment rules. A custom plan is available free.
What is the difference between process and outcome measures in BHA FPX 2110 Assessment 3?
Process measures show whether the new steps are followed, such as evening slots filled; outcome measures show whether the goal is reached, such as days from order to scan.