BUS FPX 4016 Assessment 2 entry mode recommendation example

Reviewed by Rupert Danvers, MBA Global Business Relationships Capella University Free custom sample in 24 to 48h

This BUS FPX 4016 Assessment 2 sample paper is an entry mode recommendation for how a US HVAC component maker should enter Mexico, weighing a shelter arrangement, a contract manufacturer and its own plant. It belongs to Capella BUS FPX 4016, Global Business Relationships, which BS in Business students take as BUS-FPX4016. The paper states the decision and what the firm is optimizing for, lays out the three options and trades control against exposure for each, building on the country findings. It argues its strongest rejection, explains why a wholly owned subsidiary is not right now, makes the choice and sets a condition that would change it.

CourseBUS FPX 4016 Global Business Relationships
AssessmentAssessment 2
Paper typeEntry mode recommendation
LengthAbout 1,080 words, 5 pages
FormatAPA 7 student paper
SchoolCapella University
ProgramBS in Business
UpdatedSeptember 2026

Free sample paper for BUS FPX 4016 Assessment 2

1

Choosing How to Enter Mexico: A US HVAC Component Maker Weighs a Shelter Arrangement, a Contract Manufacturer, and Its Own Plant

Student Name

Capella University

BUS FPX 4016: Global Business Relationships

Instructor Name

Month Day, Year

What this part is doingThe title names the company, the country, and the options. Entry mode papers are judged on whether the choice follows from the firm's priorities, so options are named.
2

The Decision

The earlier country analysis recommended that Carlisle Thermal, the composite Ohio component maker, move its wiring harness assembly to Mexico. The analysis identified proximity, tariff-free trade under the United States-Mexico-Canada Agreement for qualifying goods, an experienced harness workforce, and Mexico's IMMEX program for import-assemble-export operations as reasons to enter, and identified regional security, judicial uncertainty, and the 2026 trade agreement review as risks. This paper decides how to enter.

What the Firm Is Optimizing For

Carlisle's leadership has set its priorities. First, product quality, because its customers, equipment manufacturers, reject defective harnesses and can switch suppliers. Second, speed to production, because customers want lower prices within 18 months. Third, limited exposure, because Carlisle has never operated outside the United States and does not want to commit large capital to a first international venture. Fourth, cost savings of at least 20% on harness production, after shipping and management costs. Stating these priorities first allows the entry modes to be judged against them rather than against general pros and cons. The priorities were ranked by Carlisle's leadership team in a single meeting, and the ranking was recorded so that it could not shift later to favor a preferred option.

The Options

Option 1, contract manufacturing: an established Mexican harness manufacturer builds Carlisle's harnesses to its specifications. Carlisle owns no facility and employs no one in Mexico. Option 2, shelter arrangement: a shelter company, which already operates in Mexico, provides the legal entity, employs the workers, and handles payroll, customs, and permits, while Carlisle supplies equipment, materials, production management, and quality control. Carlisle directs the operation without forming its own Mexican company at first, which shortens the start-up considerably. Option 3, wholly owned subsidiary: Carlisle forms a Mexican company, leases or buys a plant, hires its own workers, and manages everything itself from the start.

Control Traded Against Exposure

The options trade control against exposure. Contract manufacturing gives the least control, since the contractor manages production and quality, but the least exposure, since Carlisle invests little and can leave by ending the contract. A wholly owned subsidiary gives the most control and the most exposure: Carlisle bears all legal, labor, and security risks and makes a large, long-term investment. A shelter arrangement falls between: Carlisle controls production and quality, while the shelter company carries the legal and employment responsibilities, and Carlisle can later convert to its own subsidiary once it has experience. Hill and Hult (2019) describe entry modes as differing in the control they give a firm over operations and in the resources and risk they require, and the choice as a trade-off between these. Framing the choice as control traded against exposure makes clear what each option gives up to gain its advantage.

What this part is doingThe options are compared on the dimension that matters most for this firm. Scorers reward entry mode analyses that frame the trade-off.
3

Built on the Country Findings

The choice builds on the country findings. Because northern Mexico has experienced harness manufacturers, contract manufacturing is available. Because shelter companies are well established in Mexico's industrial parks, a shelter arrangement can be set up quickly, often within six months. Because security varies by region, a shelter company's knowledge of stable locations reduces risk. Because business relationships depend on trust and local knowledge, a shelter company's existing relationships with officials and suppliers help a newcomer. And because the 2026 trade review creates uncertainty, a mode that limits long-term capital commitment is valuable.

The Strongest Rejection Argued

The strongest rejected option is contract manufacturing, and the case for it is argued at full strength. It is the fastest to start, since the contractor already has trained workers and a plant; it requires almost no capital; and Carlisle could compare several contractors on price. If the 2026 trade review goes badly, Carlisle could shift production back or elsewhere without stranded assets. The argument against it rests on Carlisle's first priority, quality. Carlisle's customers have strict specifications, and a contractor producing harnesses for several companies may not give Carlisle's work priority or maintain its quality standards. Carlisle would also share its designs and processes with a firm that could later compete with it. Because quality is Carlisle's first priority and its reputation with customers depends on it, less control over production is too costly.

Why Not a Wholly Owned Subsidiary Now

A wholly owned subsidiary would give Carlisle full control and avoid shelter fees, which typically add a percentage to labor costs. But it would require forming a Mexican company, registering with tax and labor authorities, obtaining the IMMEX authorization directly, hiring a Mexican human resources and legal team, and signing a long-term lease, all before producing a single harness. For a company with no international experience and an 18-month deadline, the time and risk are too great. The subsidiary becomes attractive later, once Carlisle has learned to operate in Mexico and its volume justifies the overhead.

The Choice

Carlisle should enter through a shelter arrangement in a stable northern industrial city. It satisfies quality through Carlisle's direct control of production, speed through the shelter company's existing entity and services, limited exposure through reduced legal and employment obligations and leased space, and cost savings through Mexican labor rates. Carlisle should send an experienced production manager and a quality engineer from Ohio for the first two years and hire Mexican supervisors early, so that local leaders are trained by the time the Ohio staff return home.

A Condition That Would Change It

The choice would change under certain conditions. If Carlisle's volume grows beyond about 400 workers in Mexico, the shelter company's fees may exceed the cost of running its own subsidiary, making conversion worthwhile. If the 2026 trade review imposes tariffs on harnesses, Carlisle might pause expansion or shift toward contract manufacturing to reduce commitment. And if a contractor could demonstrate quality equal to Carlisle's own plants, with protections for its designs, contract manufacturing might be reconsidered. Naming a condition that would change the choice shows the decision is tied to circumstances that can be watched.

What this part is doingThe paper states specific conditions for changing the entry mode. Scorers reward decisions that include conditions for revision.
4

Conclusion

Optimizing for quality, speed, limited exposure, and cost, Carlisle should enter Mexico through a shelter arrangement, which trades some control for much lower exposure than a subsidiary while preserving the control that contract manufacturing would give up. The choice builds on the country findings and would change with growth, trade policy, or evidence of contractor quality.

5

References

Hill, C. W. L., & Hult, G. T. M. (2019). International business: Competing in the global marketplace (12th ed.). McGraw-Hill Education.

BUS FPX 4016 Assessment 2 instructions, in plain terms

The instructions ask you to recommend an entry mode for the business and country from Assessment 1. You identify the firm's priorities, describe the realistic options, such as exporting, licensing, contract manufacturing, shelter arrangements, joint ventures and wholly owned subsidiaries, compare them on control, risk, capital, speed and flexibility, and recommend one with reasons and conditions. The recommendation should follow from the country analysis and the firm's goals, so a firm protecting proprietary designs may accept more cost for more control. International business texts on entry modes and Mexico's maquiladora and IMMEX programs support the comparison. The options should be realistic for the firm's size and international experience, and the paper should say what the firm would need in place before starting.

How this BUS FPX 4016 Assessment 2 example is built

Criteria, options, comparison, commitment. The opening states what this firm is actually optimizing for, since a business protecting a brand and one chasing volume will rationally choose differently. Each option then gets a block covering control retained, capital exposed, speed of entry and what the firm gives up. A comparison block sets them against the stated criteria rather than against each other's general merits. The commitment follows with the reasoning that decided it, and a separate passage argues against the strongest rejected alternative rather than dismissing it. A risk block covers what the chosen route exposes the firm to. The closing states what change in the country would make a different mode preferable. Figures carry sources and the country facts come from the earlier assessment.

BUS FPX 4016 Assessment 2 scoring guide: what Distinguished looks like

The scoring guide rates the firm's priorities, the options, the comparison, the recommendation and the conditions. Priorities reach Distinguished when stated plainly, such as protecting product quality while limiting capital at risk during the first two years. The comparison scores higher when each option is weighed on the same criteria, especially control traded against exposure. Building on the country findings earns credit, for example using labor availability in Nuevo León to judge the contract manufacturer option. Arguing the strongest rejected option shows depth rather than setting up weak alternatives. The recommendation should commit, with a condition for revisiting, such as moving to an owned plant once annual volume passes a set threshold. Sources for costs and program rules strengthen the case.

BUS FPX 4016 Assessment 2 help: mistakes that cost marks

Students often describe entry modes from a textbook without applying them to the firm and country. Another common mistake is recommending a wholly owned subsidiary for a small firm without weighing capital, legal exposure and management time. Options are compared on different criteria, which makes the comparison unfair. The country findings from Assessment 1 are ignored, so the recommendation floats free of evidence. No condition for revisiting is given, although entry modes often change as a firm learns. The rejected options are dismissed in a sentence. Exit costs are overlooked. A comparison table on control, capital, risk, speed and exit, followed by a short paragraph on the choice, makes the recommendation clear and defensible.

Get a BUS FPX 4016 Assessment 2 example written to your instructions

Send the Assessment 2 instructions and your BUS FPX 4016 scoring guide, along with the country assessment your first paper produced. We write a custom example against those criteria and return it in 24 to 48 hours. The first custom sample is free, and the argument against the rejected route is where the analysis in this assessment actually sits. The paper above is an original model document written by our desk, not a submitted student paper and not an official Capella University document.

More BUS FPX 4016 papers and BS in Business samples

BUS FPX 4016 Assessment 2 questions, answered

Is there a safest entry mode?

Exporting risks least capital and gives up most control, which makes it safe in one sense and weak in another. There is no generally correct answer, and the criteria are reading whether your choice follows from what you established about the country and the firm. A defended low risk route scores as well as an ambitious one.

How do I quantify capital at risk?

Approximately, with a stated basis. Setup costs, inventory committed, staff hired, and anything that could not be recovered on exit. Exact figures are rarely available and rarely necessary. What the criteria want is evidence that you know the modes differ enormously in what they put at stake.

Should I name a specific partner?

Naming criteria for selecting one matters more than naming a company. What capability, what market access, what would make them dependable, and what they would want from the arrangement. A named partner with no selection reasoning is weaker than clear criteria applied to a described type of firm.

Where can I find a free BUS FPX 4016 Assessment 2 sample paper?

This page holds the full entry mode recommendation for the HVAC maker in Mexico, comparing shelter, contract manufacturing and an owned plant, with the choice and a condition. It builds on the country assessment.

What is a shelter arrangement in BUS FPX 4016 Assessment 2?

An arrangement where a Mexican shelter company employs the workers and handles legal and administrative matters while the foreign firm controls production, reducing the firm's legal exposure during entry.