Free sample paper for BUS FPX 4993 Assessment 4
Implementing and Presenting a Bakery's On-Time Delivery Plan: Accountability to a Named Person, Funding by Displacement, the Loop Closed on Success, the Presentation as Its Own Argument, and What Happens After
Student Name
Capella University
BUS FPX 4993: Business Capstone Project
Instructor Name
Month Day, Year
The Recommendation Being Implemented
Ridgeline Bread Company will drop its 15 lowest-volume wholesale products, close the daily order window at 2:00 p.m. instead of the evening, and require the owner's approval for any new product, supported by a half-hour earlier production start for six weeks as a bridge. The goal, fixed at the start of the project, is on-time delivery of at least 93% for four consecutive weeks by week 16, with Harvest Fresh at 95% or better.
Accountability Down to a Person
Each task is assigned to one named person, not to a department, because tasks assigned to groups often belong to no one. Dave Morrison, production manager: rebuild the nightly production schedule around the reduced product list by week 2, and cut changeovers from 44 to 30 or fewer a night by week 6. Amanda Brooks, sales manager: call every customer who buys any of the 15 products by week 2, offering a replacement product, and notify all customers in writing of the new cutoff by week 2, effective week 4. Mike Sullivan, delivery supervisor: change the loading sequence so the first route's products are baked first, by week 3. Lisa Warren, controller: produce a weekly one-page report of on-time delivery, changeovers, last-load time, courier runs, and wholesale sales, every Monday from week 1. Tom Hughes, owner: approve or reject any new product request at a monthly product review starting in week 4, and call Harvest Fresh's buyer personally in week 1 to explain the plan. A task that belongs to a department belongs to nobody on a busy night.
Funded by Displacement
The plan is funded by stopping other spending, not by new money. The bridge, a half-hour earlier start for six weeks, costs about 22 employees times half an hour times 36 nights times 27 dollars, or about 10,700 dollars. Retraining and order system changes cost about 5,000 dollars. The total of about 15,700 dollars comes from three sources: the regional trade show booth planned for next quarter, about 12,000 dollars, is postponed a year; courier rush runs, averaging about 360 dollars a week, are expected to fall by at least half, saving about 2,900 dollars over the 16 weeks; and the late delivery credits, averaging about 790 dollars a week, should fall as on-time delivery rises. Funding by displacement shows the owner that the plan does not simply add cost.
Timeline
Weeks 1 and 2: owner calls Harvest Fresh; sales calls affected customers; production builds the new schedule; bridge start begins. Weeks 3 to 6: new cutoff takes effect in week 4; products are dropped in week 4; loading sequence changes. Weeks 7 to 12: bridge ends in week 6; monitoring continues. Weeks 13 to 16: success measures checked; results presented.
The Loop Closed on Success
The plan closes the loop by checking results against the measures set at the start, not new ones. At week 16, the controller reports: on-time delivery for the last four weeks; Harvest Fresh on-time rate; courier runs compared with the baseline; and wholesale revenue compared with the same weeks last year, to check that no more than 2% was lost. If on-time delivery is below 90% at week 10, the runner-up option, a full one-hour earlier start, is triggered without waiting for week 16. If all measures are met, the bridge stays off and the project closes. If some are met and others are not, the report says which, and why.
The Presentation as Its Own Argument
The presentation to the owner is built as an argument, not a summary of work done. Minto (2009) recommends starting with the answer and then giving the supporting reasons in order, since a busy reader wants the conclusion first. The first slide states the recommendation and its cost: "Drop 15 low-volume products and move the order cutoff to 2:00 p.m. to reach 93% on-time delivery in 16 weeks for about 26,000 dollars, instead of losing about 332,000 dollars a year." The next three slides give the three reasons: the data link lateness to the last oven load, the growing product list causes the delay, and this option scores best on criteria set in advance. The following slides show the plan and the funding. The final slide asks for one decision: approval to begin on Monday. Supporting detail, such as the full scoring and cost tables, sits in an appendix for questions. A presentation that asks for nothing gets nothing.
Risks During Implementation
Three risks could derail the plan. First, sales representatives may quietly keep accepting late orders or custom requests from favored customers; the controller's weekly report will show changeovers and orders received after 2:00 p.m., so any drift is visible. Second, a customer who loses a favorite product may leave; sales will call the three large customers who valued the dropped products before the change, not after it. Third, production staff may resist the new schedule; Dave will involve the two shift leads in building it during week 1, so the schedule reflects how the night actually runs.
Anticipated Questions
The presentation prepares for the owner's likely questions. "Will we lose customers over the dropped products?" Customer interviews found 3 of 20 large customers considered any of the 15 essential, and sales will offer each a replacement. "Why not just buy another oven?" It takes five months, missing the Harvest Fresh deadline, and does not stop the product list from growing again. "Is this the drivers' fault?" The data show that deliveries are on time when production finishes early, even with new drivers.
What Happens After It Ends
Some parts of the plan continue after the project closes. The monthly product review becomes permanent, and any new product request must include expected volume and the production time it needs. The 2:00 p.m. cutoff stays. The controller's weekly report continues as a monthly report. The second oven decision will be revisited in 12 months if wholesale volume grows more than 15%. Driver retention, excluded from this project, is referred to the owner as a separate project.
Conclusion
Ridgeline's plan names one person for each task, funds its 15,700 dollar cost by postponing a trade show and reducing rush runs and credits, and checks results at week 16 against the measures set at the start, with the runner-up triggered if on-time delivery is below 90% at week 10. The presentation leads with the answer and asks for approval to begin. After the project, the product review, cutoff, and reporting continue.
References
Minto, B. (2009). The pyramid principle: Logic in writing and thinking (3rd ed.). Pearson Education.
Reading the BUS-FPX4993 Assessment 4 instructions
In the final capstone assessment you turn your recommended option into a working plan and present it to decision makers. You break the recommendation into actions, each with an owner and due date, state the cost and where the money comes from, set a timeline, connect the measures back to the success criteria defined in Assessment 1, identify risks during implementation and prepare a presentation that makes the case on its own. The presentation should be built for its audience, often a busy owner or executive, rather than summarizing the whole project. Project management and business communication research support the plan.
How this BUS FPX 4993 Assessment 4 example is built
Actions, owners, money, measures, presentation. The opening restates the recommendation in one sentence. An actions block breaks the recommendation into discrete work, each piece carrying an accountable role and a due date. A money block states the cost and its source, naming what gets displaced where no new budget exists. A sequence block sets dependencies out. A measures block returns to the success definition from the first assessment and says what will be measured, when, and what result would mean the project failed. A risk block names the handful of things most likely to stop it, each with the response it would receive. Where a presentation is required, a separate block treats it as its own deliverable with its own argument. The closing states what happens after the project ends.
Reading the BUS FPX 4993 Assessment 4 scoring guide
Capella's criteria cover the actions, the accountability, the funding, the timeline, the measures, the risks and the presentation. Actions reach Distinguished when each has a named person and a date, not a department. Funding scores higher when the source is stated, such as money moved from overtime to a second delivery van. The timeline earns credit when realistic. Measures are judged on whether they tie back to the success criteria from Assessment 1. Risks should have responses. The presentation should argue for the plan by itself, with anticipated questions answered. What happens after the plan ends should be addressed. Distinguished capstones leave the owner ready to say yes.
BUS FPX 4993 Assessment 4 help from the desk
Implementation plans often assign actions to "management" or "the team," so nobody is accountable. Another weakness is presenting a cost without saying where the money will come from. The measures are new rather than the success criteria set at the start, so the project cannot tell whether it solved the problem it defined. Risks are listed without responses. The presentation summarizes all four assessments instead of making one argument to the owner. The paper ends at launch with no plan for keeping the change in place. Building a one-page action table with owner, date and cost, and a short slide sequence that opens with the problem and the ask, gives the capstone a strong finish.
Get a BUS FPX 4993 Assessment 4 example written to your instructions
Send the Assessment 4 instructions and the BUS FPX 4993 scoring guide from your courseroom, with the options analysis and recommendation your earlier assessments produced. We write a custom example against those exact criteria and return it in 24 to 48 hours. The first custom sample is free, and closing the loop back to the success definition is what makes a capstone read as one project. The paper above is an original model document written by our desk, not a submitted student paper and not an official Capella University document.
More BUS FPX 4993 papers and BS in Business samples
- BUS FPX 4993 Assessment 1: Problem Definition and Scope
- BUS FPX 4993 Assessment 2: Cross Functional Analysis
- BUS FPX 4993 Assessment 3: Options Priced and Compared
- ECO FPX 1150 Assessment 1: Budget Analysis
- BUS FPX 4802 Assessment 1: Change Case Diagnosis
- BUS FPX 1011 Assessment 1: Management Analysis
- BUS FPX 4801 Assessment 1: Ethical Dilemma Case
BUS FPX 4993 Assessment 4 questions, answered
How detailed should the implementation be?
Enough that somebody could start on Monday and know what they are doing. Actions with owners, dates and dependencies, at a level a manager could work from. A full project schedule consumes space the measures and risk sections needed, and those are where this assessment concentrates its credit.
What should the presentation contain?
The recommendation, what it costs, what it returns and what would make it fail, in that order. A decision maker wants the answer and the risk. Reducing every section of the report to a slide produces something nobody can act on and is the commonest way this part of the assessment is lost.
Should the final assessment summarize the earlier ones?
Only in a paragraph, and only to establish what it is building on. The criteria are reading whether the recommendation survives everything the earlier analysis established, which requires using that work as evidence rather than restating it. A recap is the shape a capstone takes when the integration never happened.
Where can I find a free BUS FPX 4993 Assessment 4 sample paper?
The full implementation plan and presentation for the bakery's on-time delivery project appears on this page, with actions owned by named people, funding by displacement, success measured against the original criteria and anticipated questions.
What should the capstone presentation include in BUS FPX 4993 Assessment 4?
The problem in one slide, the recommendation, the cost and its source, the timeline, how success will be measured and what you are asking the audience to approve. It should stand as an argument on its own.