| Course | NURS FPX 9040 Doctor of Nursing Practice 5 |
|---|---|
| Assessment | Assessment 3 |
| Paper type | Stakeholder handoff and sustainability plan |
| Length | About 1,090 words, 5 pages |
| Format | APA 7 student paper |
| School | Capella University |
| Program | DNP |
| Updated | September 2026 |
Free sample paper for NURS FPX 9040 Assessment 3
Handing Off a DNP Project So It Lasts: Nurse-Administered Bedside Swallow Screening for Patients With Stroke
Student Name
Capella University
NURS FPX 9040: Doctor of Nursing Practice 5
Instructor Name
Month Day, Year
Introduction
Many improvement projects fade when their leader moves on. My DNP project trained emergency and neurology unit nurses to perform a bedside swallow screen for patients with suspected stroke before any oral intake, including medications. Over 20 weeks, the percentage of stroke patients screened before any oral intake rose from 52% to 91% across both units. Formal dysphagia screening protocols have been associated with lower rates of pneumonia after stroke (Hinchey et al., 2005). This paper describes how the project is being handed off so that screening continues after I leave the site.
Why Sustainability Needs a Plan
Sustainability is the continued delivery of an intervention and its benefits after initial implementation support ends. A review of sustainability in public health and health care found that many evidence-based interventions are not sustained, and identified factors such as organizational capacity, fit with routines, funding, and ongoing evaluation as important influences (Shelton et al., 2018). The handoff plan addresses each.
One Page for Leadership
Leadership received a one-page summary with four sections: what the project did, what it achieved, what it needs to continue, and who owns it. The page states the screening rate before and after, the one pneumonia case in screened patients during the project compared with four in the prior comparable period (with the caution that numbers are small), the ongoing costs (about 12 hours of educator time per year and screening supplies), and the named owner. A single page is what a busy director will read, and it must contain the request, the cost, and the owner, or the project will be one more report filed and forgotten.
Slides for the Back of the Room
A short slide deck was prepared for staff meetings, designed to be readable from the back of a conference room: large type, one message per slide, a run chart of the screening rate, and the three steps of the screen. The deck includes a slide explaining why screening matters, with a brief story of a patient who aspirated medication before screening was introduced, told without identifying details. The deck is stored on the unit's shared drive so that educators can use it at orientation.
A Named Owner Who Agreed
The project's owner is the stroke program coordinator, a registered nurse who has agreed in writing to own the screening protocol, including training, monitoring, and reporting. Her role description has been updated to include these duties, and her manager approved the change in a meeting that I attended. A backup owner, the neurology unit's nurse educator, has also agreed. An owner named without agreement is a hope, not a plan; written agreement and a changed role description make ownership real.
What Must Keep Happening
The handoff lists what must continue for screening to last. The swallow screen must remain in the electronic record's stroke order set and admission assessment, where it prompts nurses automatically. New emergency and neurology nurses must complete the screening competency during orientation. The stroke program coordinator must review the screening rate monthly and report it quarterly to the stroke committee. Screening supplies, including water and thickened liquids, must remain stocked in the emergency department. Competency must be revalidated annually, using the same skills checklist that was used in the project, so that the standard does not drift over time.
Evidence of Early Durability
In the four weeks after my role ended, the automated report showed screening rates of 89%, 90%, 87%, and 92%, close to the project's final level. Four weeks is too short to prove sustainability, but it shows that the change held through the first period without the project lead, which is when many changes begin to slip. The stroke committee will review the rate at its next two quarterly meetings before deciding whether any additional support is needed.
Built Into Routines
The most durable parts of the project are those built into routines that exist for other reasons. The stroke committee already meets quarterly and reports to accreditation surveyors, so adding the screening rate to its dashboard gives it a permanent place. Orientation already includes stroke competencies, so the swallow screen was added to an existing module rather than creating a new one.
What Depended on the Writer
The handoff is honest about what depended on me. During the project, I personally reviewed charts weekly, gave feedback to nurses who missed screens, and ran make-up training sessions for night staff. These activities will not continue in the same form. The weekly chart review is replaced by an automated monthly report. Individual feedback will be given by charge nurses during their routine huddles. Night training is now part of the educator's annual schedule. Some loss of intensity is expected, and the monthly report will show whether it matters. Naming these activities also tells the new owner where the risks lie, so that she can decide which, if any, to continue in some form.
Risks to Sustainability
Three risks could undo the gains. Turnover among emergency nurses is high, and new nurses may not complete the competency promptly if orientation schedules are compressed. Changes to the electronic record, such as an order set revision by another department, could remove the screening prompt without anyone noticing. And if the stroke coordinator position becomes vacant, ownership could lapse. The handoff addresses these risks by adding the screen to the orientation checklist that managers sign, by asking the informatics team to flag the order set so that any change triggers a review by the stroke committee, and by naming a backup owner.
Spreading Beyond the Two Units
The stroke committee has discussed extending screening to the hospital's medical units, where patients with stroke are occasionally admitted when neurology beds are full. The handoff recommends doing so after six months of stable performance on the current units, with the same training materials and competency.
Monitoring After Handoff
The stroke coordinator will review the screening rate monthly for the first year. If the rate falls below 80% for two consecutive months, she will review a sample of cases and repeat targeted training.
Conclusion
Handing off the swallow screening project so that it lasts required a one-page summary for leadership, staff-ready slides, a named owner who agreed in writing, a clear list of what must continue, integration into existing routines, and honesty about what depended on me.
References
Hinchey, J. A., Shephard, T., Furie, K., Smith, D., Wang, D., & Tonn, S. (2005). Formal dysphagia screening protocols prevent pneumonia. Stroke, 36(9), 1972-1976. https://doi.org/10.1161/01.str.0000177529.86868.8d
Shelton, R. C., Cooper, B. R., & Stirman, S. W. (2018). The sustainability of evidence-based interventions and practices in public health and health care. Annual Review of Public Health, 39, 55-76. https://doi.org/10.1146/annurev-publhealth-040617-014731
What the NURS FPX 9040 Assessment 3 instructions ask for
The final assessment asks you to hand off your DNP project to the site so it continues after you leave. You present results and the cost of continuing to leadership, prepare materials for the audience, name the person taking ownership and confirm their agreement, list what must be maintained, describe how the change was built into routines, identify what depended on you, assess risks and plan monitoring. Sustainability frameworks and evidence on spread support the plan. The handoff is part of your real project, so the owner, results and site details must be your own. Honesty about your own role in the project's success strengthens the plan.
Inside the NURS FPX 9040 Assessment 3 example
Leadership summary, presentation, handoff, ownership, maintenance, materials. The leadership summary states the result, the cost of continuing and the decision requested, on one page. The presentation set follows the room it will be given in, with the number of slides matched to the time allotted. The handoff document names the person taking ownership and confirms they have agreed. A maintenance block lists what must continue: training for new staff, the report that has to run monthly, the audit that catches drift. A materials block says where every instrument, template and dataset is stored and who has access. A dependency block names anything that only held because of the writer's own presence. The summary is one page because that is what gets read.
Reading the NURS FPX 9040 Assessment 3 scoring guide
The scoring guide rates the leadership summary, the presentation, the handoff, the ownership, the maintenance plan and the sustainability analysis. The leadership summary reaches Distinguished when it states the result, the cost of continuing and the decision requested on one page. Ownership scores higher when a named person has agreed in writing. Maintenance earns credit when the tasks that must continue, such as monthly audits and new staff training, are listed with who does them. Building the change into routines, such as order sets and orientation, shows durability. Admitting what depended on the writer shows insight. Risks and monitoring after handoff complete the plan. Professional writing and APA form are graded, and the annotation beside the ownership section explains why agreement matters.
NURS FPX 9040 Assessment 3 help: mistakes that cost marks
Students often end the project with a presentation and no handoff, so the change fades within months. Another common mistake is naming an owner who has not agreed. Maintenance tasks are left implicit, and no one does them. The change depends on the student's personal effort, reminders and audits, which disappear when they leave. Risks, such as staff turnover and competing priorities, are ignored. Monitoring after handoff is not assigned. Spread to other units is assumed rather than planned. The owner, results and site must be real parts of your project; a model handoff plan can be drafted around them on request.
Get a NURS FPX 9040 Assessment 3 example written to your instructions
Send the Assessment 3 instructions and the scoring guide from your NURS FPX 9040 courseroom, plus the findings and the site your handoff materials serve. We write a custom example against those exact criteria and return it in 24 to 48 hours. The first custom sample is free, and a handoff that names an owner and what they must maintain is what keeps the work alive. The paper above is an original model document written by our desk, not a submitted student paper and not an official Capella University document.
More NURS FPX 9040 papers and DNP samples
- NURS FPX 9040 Assessment 1: A Dissemination Plan Built Around What Each Audience Can Do
- NURS FPX 9040 Assessment 2: Writing the DNP Manuscript to Its Venue
- NHS FPX 8002 Assessment 3: Personal Leadership Portrait Part 2
- NURS FPX 9030 Assessment 3: Interpreting DNP Project Results
- NURS FPX 8004 Assessment 3: Revising in Response to Feedback
- NURS FPX 9020 Assessment 3: Closing the Implementation Phase With Clean Data
NURS FPX 9040 Assessment 3 questions, answered
What goes on the first page of a leadership summary?
The result and the decision. Executives read the top of the page and skim the rest, so background belongs after the ask rather than before it. Say what changed, what it costs to keep, and what you are recommending, then support it. A summary that opens the way an abstract does has spent its most valuable space.
Why does the handoff need a named person?
Because otherwise the intervention ends with your residency. Someone has to run the monthly report, train the staff who arrive next year and notice when practice drifts back, and a document naming a role rather than a person means nobody does it. Confirm they have agreed, and give them everything they need in one place.
Is it worth admitting the project depended on me?
It is the most useful thing you can write. Interventions frequently hold because someone attentive was rounding daily, and a site that inherits the work without knowing that will be puzzled when it lapses. Naming the dependency lets the organization decide whether to fund the role, build the step into routine, or accept that the change will fade.
Where can I find a free NURS FPX 9040 Assessment 3 sample paper?
This page contains the full sustainability handoff for bedside swallow screening, with the one-page summary, the agreed owner, maintenance tasks, routines, risks and monitoring. A free custom model is available.
Why does the NURS FPX 9040 Assessment 3 handoff need a named person?
Because a change owned by a committee or a role often fades when attention moves. A named person who has agreed to maintain it, with specific tasks, is the strongest predictor that the project lasts.