BUS FPX 1011 Assessment 3 Control and Evaluation Report example

Reviewed by Rupert Danvers, MBA Management Fundamentals Capella University Free custom sample in 24 to 48h

This BUS FPX 1011 Assessment 3 sample paper is a control and evaluation report that designs a control system for a bakery store: measures the team can move, standards with a basis, review intervals, response thresholds and an honest note on what the measures miss. It closes Capella BUS FPX 1011, Management Fundamentals, catalog code BUS-FPX1011. The report restates the situation, chooses measures the store team can influence and sets standards drawn from past sales and company targets. It argues the review interval against the problem, sets a threshold that triggers a response, names who records and who reviews each measure and admits what the measures cannot capture, such as customer goodwill.

CourseBUS FPX 1011 Management Fundamentals
AssessmentAssessment 3
Paper typeControl and evaluation report
LengthAbout 1,080 words, 5 pages
FormatAPA 7 student paper
SchoolCapella University
ProgramBS in Business
UpdatedSeptember 2026

Free sample paper for BUS FPX 1011 Assessment 3

1

A Control System for a Bakery Store: Measures the Team Can Move, Standards With a Basis, Intervals, Thresholds, and What the Measures Miss

Student Name

Capella University

BUS FPX 1011: Management Fundamentals

Instructor Name

Month Day, Year

What this part is doingThe title names the setting and the five parts of the control system. Controlling is judged on whether measures lead to action, so thresholds are named.
2

The Situation

Hearthstone Bakery's third store opened four months ago and has struggled with low morning sales, items selling out early, slow service, and staff turnover. The owner and store manager have begun an action plan to improve mornings. A control system is needed so that the store's performance is monitored and problems are caught early, rather than discovered only when weekly sales fall short. Robbins and Coulter (2018) describe controlling as monitoring activities to ensure they are accomplished as planned and correcting significant deviations; the system below applies that idea to one store.

Measures the Team Can Move

The system uses five measures, chosen because the store team can influence them through their own actions. Weekday morning sales, 6 a.m. to 9 a.m. The team influences this through speed, product availability, and service. Average counter wait time in the morning, measured from joining the line to receiving an order, sampled for 20 customers each morning. The team influences this through staffing and preparation. Sell-out time for each product category. The team influences this through ordering from the central kitchen. Waste, the value of unsold items discarded at closing. The team influences this through ordering and by moving items to discount late in the day. Staff retention, the number of staff who have left in the past 90 days. The manager influences this through scheduling, training, and recognition. Total sales and profit were considered but not used as primary control measures, because they depend on factors beyond the store team's control, such as rent, central kitchen costs, and pricing decisions made by the owner. They are still reviewed monthly, but the store team is held to the measures it can move. Choosing measures the team can move ensures that each measure tells the team what to do differently, not just how the store is doing.

What this part is doingEach measure is tied to actions the team controls. Scorers reward control systems built on measures within the team's influence.
3

Standards With a Basis

Each measure has a standard, and each standard has a basis. Morning sales: 1,600 dollars a day, the target in the action plan, based on the count of morning customers and the average purchase observed in the first week of the plan, adjusted for the new menu. Wait time: under four minutes, based on the owner's observation that commuters in the area are choosing a competitor's drive-through that typically serves customers in about three to four minutes. Sell-out time: no category sold out before 2 p.m., based on the store's hours and the second daily delivery, which should keep stock available through the afternoon. Waste: under 6% of the day's baked goods by value, based on the average of the two established stores. Retention: no more than one departure in any 90-day period, based on the owner's experience that the established stores lose about four staff a year out of eleven. A standard with a basis can be defended and revised when the basis changes. A standard chosen without one invites argument.

Interval Argued Against the Problem

The review interval depends on how quickly each problem can do damage. Morning sales and wait time are reviewed daily, because a bad week of slow service can lose regular commuters who may not return. Sell-out time and waste are also recorded daily, because ordering decisions are made each afternoon for the next day. All five measures are reviewed together on a weekly Friday call between the store manager and owner, where patterns rather than single days are discussed. Retention is reviewed monthly, because staff departures are less frequent and a monthly view is enough to see a trend. Reviewing everything daily would waste time; reviewing everything monthly would catch problems too late.

What this part is doingReview intervals are chosen to match the speed of each problem. Scorers reward control systems that argue their intervals.
4

A Response With a Threshold

Each measure has a threshold that triggers a specific response. Morning sales below 1,300 dollars on three weekdays in a week: the manager and owner review the menu and staffing on the Friday call and change one thing the next week. Wait time above five minutes on two mornings in a week: add a counter staff member the following week or move preparation earlier. Any category sold out before noon: increase that category's order for the next day. Waste above 8% on three days in a week: reduce that day's order and move remaining items to a late-afternoon discount. Two staff departures within 90 days: the owner holds exit conversations and reviews schedules and pay with the manager. Thresholds tell the team when a deviation is significant enough to act on, so that normal day-to-day variation does not trigger constant changes. A threshold turns a measure into a decision rule, so the team knows when to act without debating every number.

Who Records and Who Reviews

A control system works only if the data are recorded reliably. The morning shift lead records morning sales from the register report and times 20 customers each morning with a phone timer, entering both on a shared sheet by 10 a.m. The closing staff member records sell-out times throughout the day and the value of waste at closing. The manager records staff departures. The manager reviews the sheet daily, and the owner reviews it before each Friday call. Assigning recording to specific roles keeps the data from depending on whoever remembers.

What the Measures Miss

The measures do not capture everything that matters. They do not measure product quality directly; a store could meet every standard while its pastries become stale or inconsistent. They do not measure customer satisfaction beyond wait time; friendliness and order accuracy matter to regular customers. They do not capture whether staff are learning and developing, which affects retention over time. And they do not reflect conditions outside the store, such as a new competitor opening nearby. To cover some of these gaps, the owner will visit unannounced twice a month to taste products and observe service, and the store will add a simple comment card at the counter. These are not formal measures, but they provide information the numbers cannot.

Conclusion

The control system uses five measures the store team can move, sets standards with a stated basis, reviews each at an interval matched to how quickly problems grow, and sets thresholds that trigger specific responses. It also states what the measures miss and adds informal checks to cover those gaps.

5

References

Robbins, S. P., & Coulter, M. (2018). Management (14th ed.). Pearson.

The Capella BUS FPX 1011 Assessment 3 instructions

The final assessment asks you to design a control system for the plan from Assessment 2. You choose measures that show progress, set standards with a basis, decide how often each measure is reviewed, define what happens when results fall short, assign who records and reviews the data and explain the limits of the measures. Controlling is the management function that closes the loop on planning. Measures should be ones the team can influence, not results driven by factors outside its control. Management texts on control systems and performance measurement support the report. The report should be practical enough for a store manager to use each week.

How this BUS FPX 1011 Assessment 3 example is built

Measures, standards, intervals, responses. The opening restates the objective from the plan in one sentence so the controls have something to control. Each measure then gets a short block covering four things: what is counted, where the number comes from, what standard it is held to and why that standard. The interval block argues the checking frequency against how fast the underlying problem can develop. The response block is the substance, naming the threshold that triggers action, who acts and what they do, which turns measurement into control. A short block names what the measure set does not capture. The closing states how the whole control system would itself be reviewed, and at what point somebody would change the measures rather than the work. Headings follow the prompt, and every standard has a basis rather than a round number.

BUS FPX 1011 Assessment 3 scoring guide: what Distinguished looks like

The scoring guide rates the measures, the standards, the review intervals, the corrective responses, the assignment of responsibility and the discussion of limits. Measures reach Distinguished when the team can move them, such as morning transactions and average ticket, rather than company-wide sales. Standards score higher when drawn from a basis like last year's sales or a target in the plan. Intervals earn credit when argued against how quickly the problem changes. A response threshold, such as two weeks below standard, makes control actionable. Responsibility should be assigned to named roles. Stating what the measures miss, such as how regular customers feel about the new store, shows judgment.

BUS FPX 1011 Assessment 3 help: mistakes that cost marks

Students often choose measures the team cannot influence, which frustrates staff and tells managers little. Another common mistake is standards without a basis, such as an arbitrary target. Review intervals are not justified, so problems are caught too late or checked too often. Corrective action is vague, such as take action if needed, instead of a threshold and a response. Responsibility is not assigned. Limits of the measures are ignored. A table with each measure, its standard, interval, threshold and owner makes the control system easy to follow and easy to run.

Get a BUS FPX 1011 Assessment 3 example written to your instructions

Send the Assessment 3 instructions and the scoring guide from your BUS FPX 1011 courseroom, with the plan your second assessment produced. We write a custom example against those exact criteria and return it in 24 to 48 hours. The first custom sample is free, and the response section is what most control reports never write. The paper above is an original model document written by our desk, not a submitted student paper and not an official Capella University document.

More BUS FPX 1011 papers and BS in Business samples

BUS FPX 1011 Assessment 3 questions, answered

How many measures should the report use?

Three or four, each with a standard, an interval and a response. More than that and none of them gets the treatment the criteria reward, and a manager checking eight numbers weekly will quietly stop checking any. Fewer measures handled completely score better than a comprehensive set handled thinly.

What if the organization does not collect the data?

Say so and describe what collecting it would take, which is a legitimate part of the answer. A measure requiring a new system is a real cost and belongs in the report. What weakens a paper is proposing a measure as though the number already exists when nobody has ever produced it.

Does control mean the same thing as discipline?

No, and the confusion costs marks. Control in this course means checking whether the plan is working and correcting it, which is about the process rather than about individuals. A report that turns into a performance management proposal has answered a different question from the one the assessment asked.

Where can I find a free BUS FPX 1011 Assessment 3 sample paper?

This page contains the full control system report for the bakery store, with team-controllable measures, standards, intervals, thresholds, owners and limits. A report built on your own plan can be requested through the form.

What is a response threshold in BUS FPX 1011 Assessment 3?

A preset point that triggers corrective action, such as morning sales falling below the standard for two weeks in a row. It turns monitoring into management.